j Projects

Projects

Pro Pump & Controls was able to completely remove, replace and perform start up two golf course pump stations within a 5 day week with a 3 technician crew.
retro1
retro2
retro3
retro4
Pro Pump & Controls conversion from a carbon steel inlet and discharge manifold assembly to stainless steel due to corrosive water.
carbontostainless1
carbontostainless2
Pressure reducing valve assembly with reverse bypass set in concrete vault on golf course. Using adequately sized vaults allows safe working room and facilitates servicing of valve.
pressure_reducing2
pressure_reducing3
18” basket strainer installed on inlet side of a 3000 GPM booster station, to pre-screen debris from a raw water feed line. (Inlet filter retro)
inlet_filter
ProPump & Controls Programmer Mike Nealy beside 72” booster pump station inlet pipe. 3 Mile Canyon Farm project in Boardman, Oregon
3_mile_canyon
72” manifold - 3 Mile Canyon Farm project in Boardman, Oregon
72_inch_manifold
Booster Station - 3 Mile Canyon Farm project in Boardman, Oregon
booster station
Pine Valley - Suction Line
pine_valley_
Pine Valley - Pump Station on test stand at factory
pine_valley_pump_station
Optima KV - Setting Guild Tank Skid On Slab
optima_kv_setting_guild_tank_skid_on_slab
Optima KV - Installed Unison Gas Conditioning Skid at Circle K 1 and 2 Digester Site
optima_kv_installed_unison_gas_conditioning_skid_at_circle_k
Optima KV - Flare Installation At Circle K 2 Digester Site
optima_kv_flare_installation_at_circle_k_2
Oak Island - (Before) Existing Drum Screen To Be Removed
oak_island_before_drum_screen_to _be_removed
Oak Island - (After) Front View Of Installed Drum Screen
oak_island_after_front_view_of_installed_drum_screen
Oak Island - (After) Side View Of Drum Screen Installation
side_view_of_drum_screen

http://www.pumpstationparts.com